Opened first floor to allow new staircase to be installed from ground floor to first.
Opening of a new stairwell, Westmuir – June
November 9th, 2011Bathroom renovation, Forfar – June
November 9th, 2011Removed old tiles, re-plasterboarded and fitted wet-wall. Installed new vanity units.
Porch repair, Forfar – May
November 9th, 2011Repaired porch roof and fitted new UPVC windows. Organised slater.
Kitchens, Dundee & Kirriemuir – May
November 9th, 2011Removed old kitchens and fitted new. Organised all trades.
Kitchen, Pearsie – April
November 9th, 2011Removed old kitchen and fitted new. Organised all trades.
Bibi’s Bakery shop alterations, St Andrews – April
November 9th, 2011Adjusted layout; kitchen and cookery classroom swapped around.
Loft conversion, Tannadice – April
November 9th, 2011Loft conversion consisted of 3 bedrooms with fitted wardrobes (1 with en-suite), a bathroom, Velux Windows and windows inserted in gable ends. Completed.
Extension, Brechin – March
November 9th, 2011Cottage extension completed; kitchen, bathroom and bedroom. All trades organised.
Extension, Kirriemuir – March
November 9th, 2011Small utility extension completed with kitchen units and hardwood flooring.
Renovate Bathroom, Kirriemuir – February
February 23rd, 2011Removed old tiles and plasterboard, and replaced with moisture resistant plasterboard and wetwall. Organised plumber to remove shower and re-fit.